Skip to content
U.S. 1 Improvements Project

U.S. 1 Improvements Project

  • Home
  • Project Information
    • Overview
    • Construction Update
    • Section RC1
      • RC1 Construction Schedule
      • SR 0132 (Street Road)
      • U.S. 1 (Lincoln Highway)
      • SR 2025 (Bristol Road)
      • SR 8017 (Street Road Interchange)
      • SR 8019 (Pennsylvania Turnpike Interchange)
    • Section RC2
      • RC2 Construction Schedule
      • U.S. 1 (Lincoln Highway)
      • SR 2044 (Rockhill Drive)
      • SR 8055 (Neshaminy Interchange)
      • SR 8067 (Penndel Interchange)
    • Section RC3
      • April 2025 Virtual Public Meeting
    • Environmental
    • FAQ
      • RC1 & RC2 FAQ
      • RC3 FAQ
      • RC3 FAQ Q&A
      • RC3 FAQ Comment Forms
  • Commuting
    • Travel Advisories
    • Bucks County TMA
    • DVRPC’s Mobility Alternatives
    • PA 511
  • News
    • News Releases
    • Progress Photos

Can you tell us where one could find these traffic studies?

A

Can you tell us where one could find these traffic studies?

That will be posted in the fall as a technical report attached to the environmental assessment document.

Post navigation

Previous PostPrevious Regarding Highland and other roads in Parkland (i.e.: Hulmeville road), there will be impact to the neighborhood as it will become even more of a cut through than it already is with the closure or limitation of frontage road access to the neighborhoods. Can PennDOT include those studies?
Next PostNext How can impact of traffic spillover to roads NOT be included in the plan. For each service road closed traffic will be forced down other quiet neighborhood roads

PennDOT District 6

© 2025 Pennsylvania Department of Transportation. All rights reserved.

Proudly powered by WordPress