- Construction to continue along the east side of U.S. 1 for construction of NB lanes.
- Full depth reconstruction and widening to be performed along the north side of Street Road for construction of WB lanes.
- Widening to be performed along west side of PA Turnpike Slip Ramp to/from Street Road for adding a turn lane.