Skip to content
U.S. 1 Improvements Project

U.S. 1 Improvements Project

  • Home
  • Project Information
    • Overview
    • Construction Update
    • Section RC1
      • RC1 Construction Schedule
      • SR 0132 (Street Road)
      • U.S. 1 (Lincoln Highway)
      • SR 2025 (Bristol Road)
      • SR 8017 (Street Road Interchange)
      • SR 8019 (Pennsylvania Turnpike Interchange)
    • Section RC2
      • RC2 Construction Schedule
      • U.S. 1 (Lincoln Highway)
      • SR 2044 (Rockhill Drive)
      • SR 8055 (Neshaminy Interchange)
      • SR 8067 (Penndel Interchange)
    • Section RC3
      • April 2025 Virtual Public Meeting
    • Environmental
    • FAQ
      • RC1 & RC2 FAQ
      • RC3 FAQ
  • Commuting
    • Travel Advisories
    • Bucks County TMA
    • DVRPC’s Mobility Alternatives
    • PA 511
  • News
    • News Releases
    • Progress Photos

Don’t environmental assessments involving road construction usually include air quality monitoring?

A

Don’t environmental assessments involving road construction usually include air quality monitoring?

Typically we do some assessments with the air quality monitoring, but it isn’t a typical component of a project level analysis. But there is air quality assessments that are underway as part of the project’s environmental documentation. Additional information regarding PennDOT’s project level air quality analysis can be found in their PennDOT Publication 321, which is available online.

Post navigation

Previous PostPrevious How will residence on Jeffrey Lane gain access to Route 1? With the service road stopping at Fox Court what will prevent our street from becoming a cut through to Parkland?
Next PostNext Have you done a traffic study on the possible increase in traffic on W. Highland Ave with the removal of all access road exits and putting the majority of exit traffic for Langhorne Manor and Parkland onto this street? Your reply to my previous questions was there are stop signs but that does not address the increase traffic through our neighborhood and specifically on this street. The street has no sidewalks and kids play and bike on this road and it is relatively quiet now, so I would like to see a possible traffic study completed.

PennDOT District 6

© 2025 Pennsylvania Department of Transportation. All rights reserved.

Proudly powered by WordPress